Loading

SUSPENSION BRIDGE

GIVE ME REASON TO PROVE ME WRONG, CONNECT THE SPACE BETWEEN
LET IT BE ENOUGH TO REACH THE TRUTH ALIVE, ACROSS THIS NEW DIVIDE

RULES AND REGULATIONS

• Each team should have two members
• Bridge constructed should be of the required span and should bear the maximum load.
• Construction should be completed within the given time using the given materials.
• Malpractices lead to disqualification.

Total Prize: ₹5K


Registration fee: ₹100
Contact:
JERIN THOMAS -8281341631
VIVEK S -8592945931
register Close